One or more photo(s) has been virtually staged. Pre-Construction. To be built. Brand new Maronda Homes Victoria M3 plan with estimated completion date of Nov 2024. CBS constructionwith full builder warranties. Terrific plan featuring large great room, stone accented front elevation, solid surface tops inkitchen, extensive ceramic tile flooring, refrigerator, blinds and much, much more.
O6195736
Single Family, Contemporary, 1 Story
3
Osceola
2 Full
2023
0.11
Acres
Public
1
Block,Stone,Stucco
Public Sewer
Loading...
Data Provided by Onboard
Walk Score measures the walkability of any address, Transit Score measures access to public transit on a scale of 1-100.
Walk Score
Transit Score
Data Provided by Walk Score
Loading...